Project

Katherine Lake Bullhead, AZ

SWP completed this project at the Katherine Access Marina. Schedule A included a full depth, full width 4R improvement of Katherine Access Road as the main roadway into the Katherine Access Marina.  The 4R work included widening the roadway template; new drainage structures; improved pullouts adjacent to the roadway; paved entrance parking area; resurfacing existing […]

Katherine Lake Bullhead, AZ Read More »

El Paso Modular Facility

KC has provided a turnkey solution in the El Paso Sector to accommodate modular facilities to house 800 persons at one site in housing pods, with supporting mechanical, electrical, plumbing, water, sewer, foundation, and other infrastructure. The holding facility, able to accommodate detention, toilets, wash basins, showers, and eating area for at least 800 individuals,

El Paso Modular Facility Read More »

Investigation, Remediation, O&M, and LTM, Former Fort Devens, BRAC Legacy Site, Devens, MA

KGS conducted work under CERCLA with oversight by EPA Region 1 and MassDEP and includes LTM at 10 Study Areas and Areas of Concern, monitoring and maintenance at three landfills, O&M of leachate collection system, 5 Year Reviews, well installation, groundwater modeling, enhanced reductive dechlorinization (ERD) of chlorinated solvent plume, and complex geochemical investigations associated

Investigation, Remediation, O&M, and LTM, Former Fort Devens, BRAC Legacy Site, Devens, MA Read More »

U.S. Department of Energy, Mission Support Alliance, Protecting Bald Eagle Habitat, Hanford Reach

EAS worked with MSA to monitor bald eagles on the Hanford Site. Bald eagle surveys were conducted annually to monitor bird use of current protected roost locations and nest sites and to document current and potential night roosts and nest sites along the Hanford Reach. Boat surveys were conducted to determine the age class, distribution,

U.S. Department of Energy, Mission Support Alliance, Protecting Bald Eagle Habitat, Hanford Reach Read More »

US DOT WFLHD- Western Federal Lands Highway Division, OR DOT 26 Mirror Lake, OR

Located in the Mt. Hood National Forest, the Mirror Lake Trailhead Relocation project included widening Oregon DOT 26 and relocation of the popular trailhead, trail modifications (removal and replacement of 9 pedestrian bridges) and a parking lot expansion. Oregon DOT 26 improvements included a mill and fill for 3,390 Ton of an ODOT Type 1,

US DOT WFLHD- Western Federal Lands Highway Division, OR DOT 26 Mirror Lake, OR Read More »

Scroll to Top